Power 850,000 kWh per day, can charge 85 million mobile phones to meet the Hefei 200,000 family day of electricity ... ... In Hefei domestic waste incineration power plants, more than 2,500 tons of domestic waste every day, "turning waste into treasure" . Such living garbage incineration power plant, Hefei, but also to build five, is expected by 2020, Hefei will be able to achieve the city's household waste "zero landfill." Incineration power generation daily net electricity 850,000 degrees to meet the 200,000 Hefei home electricity Hefei one day "made" how much garbage? June 6, this figure is 3850 tons. It is understood that on June 6 this day generated household garbage, more than 2,500 tons were sent to the Hefei MSW incineration power plant, which also reached the factory The current processing ceiling. This is the first and only incineration plant for domestic waste incineration in Hefei. It is located in Feidong Hefei Circular Economy Demonstration Park and started commercial trial operation in October 2013. From the initial treatment of 1,100 tons of household garbage everyday, to more than 2,500 tons of daily living today Garbage into the factory. As trash crane operator, working in Hefei waste incineration power plant for nearly 3 years Xu Sister, daily work is separated by transparent glass, operating six claw garbage hanging, from the foot of more than 30 meters deep garbage bin grabbed a " Another "put" the rubbish into the incinerator. "Every few minutes to vote once, grab at least eight tons of garbage." Xu Sister said that the garbage in the highest 900 ℃ high temperature "digestion", the resulting high temperature and pressure steam, and to promote steam turbine generator for power generation , And a steady stream of transmission to the grid. For her work, Xu Sister very successful, "our power plant is now generating 850,000 degrees per day, 85 million mobile phones can be charged to meet the Hefei 200,000 family day of electricity consumption, a family can use 700 years " For Wang Xuegang, the general manager of Hefei Waste Incineration Power Plant, power generation is secondary, mainly to dispose of rubbish. "Household rubbish produced by citizens is incinerated and disposed of here to achieve innocuousness, recycling and reduction " Bid farewell to landfill Rebuild 5 incineration plants 2020 Domestic waste "Zero landfill" On June 6 this day, "made" domestic garbage, and 1350 tons were sent to Hefei Longquanshan landfill. June 3, Jianghuai Morning Post, Jianghuai network reporter followed the staff of the Urban Management Bureau of Hefei came here, looking like a mountain-like landfill, the staff said that the rapid growth of the amount of rubbish in Hefei, the current treatment principle is able to burn Try to burn, the rest of landfill. In order to make all domestic waste can be decontaminated, recycling, reduction of treatment, in the "Thirteenth Five-Year" period, Hefei plans to increase 5 domestic waste incineration power plants, by 2020, Hefei domestic waste will be full incineration , "Zero landfill" treatment. The staff revealed that the five domestic waste incineration power plants are located in Feixi, Changfeng, Chaohu, Lujiang and Longquan Mountain landfill. Among them, Feixi MSW incineration plant has a daily processing capacity of 2,000 tons and is currently under bidding. The daily processing capacity of 1,000 tons of Changfeng MSW incineration plant has entered the EIA phase. The daily processing capacity of Chaohu MSW Incineration Plant is about 1,000 tons, which will be put into use as soon as the end of this year. Lujiang garbage incineration plant daily processing capacity of about 500 tons, is still textual research; and in Longquan Shan landfill to build a domestic waste incineration power plant, Japan will reach the scale of processing 3,000 tons. In other words, Hefei will have 6 future incineration plant waste incineration, Hefei, incineration of domestic waste incineration power generation will reach 9500 tons. By then, the 6 MSW incineration power plants will also address the garbage disposal problems in their respective counties while sharing the garbage disposal of the adjacent urban areas in Hefei. "Waste incineration power generation is now the mainstream of garbage disposal technology, with these six MSW incineration power plants, in accordance with the principle of the nearest treatment, the future Hefei garbage treatment is no longer need cross-city transport." Staff said the future, Longquan Shan Landfill will only landfill residue left after burning garbage, slag and other residues.
Vacuum Pressure Swing
Adsorption (VPSA) technology can produce the desired gas(es) much more
efficiently. The system segregates certain gases from a gaseous mixture at near
ambient pressure; the process then swings to a vacuum to regenerate the
adsorbent material, zeolite molecular sieves. It draws the gas through the
separation process with a vacuum, typically generated by a blower, The systems
apply pressurized gas to the separation process and also apply a vacuum to the
purge gas.
Doer can supply VPSA oxygen
plant with capacity ranging from 100-10,000 m3/h for industrial, medical or
commercial applications.
Vpsa Oxygen Generation Plant,Vpsa Oxygen Plant,Oxygen Plant For Industrial Use,Vpsa Oxygen Generator Atmospheric Cryogenic Storage Tank, VPSA Oxygen Plant, Microbulk Tank , https://www.doercryo.com