1. First of all, slowly and steadily prevent the transport tanks of bulk feed carriers from being in the car, and then fix them firmly. Under careful inspection, all parts of the transport tank have no damage due to transportation, and there is no water or debris in the transport tank of the bulk feed truck under the inspection of the open top lid, if any. It should be cleaned in a timely manner.

2. Then, the three-phase socket configured by the manufacturer together is installed near the material tower. The details to be noted here are that a waterproof device needs to be installed.

3. Plug the power plug of the transport tank of the bulk feed carrier into the top of the socket, and then start the button of the hydraulic pump. After running for two minutes, open the lift handle 6. The order of the lift and the arrows indicate If it is consistent, then it is correct. Otherwise, it is necessary to adjust the line sequence of the power line, and it is consistent to adjust to the order of operation and the arrow indication is consistent.

4. When the lifting and lowering handle 6 is operated, the lifting conveyor 7 is raised to a position 15 cm to 10 cm above the feed inlet of the material tower, and the control handle 5 is rotated to rotate the lifting conveyor 7 to the mouth of the material tower. The corresponding good position, and then start lifting conveyor 7 button to open the vertical conveyor 8 button, and finally open the flat conveyor 9 began to feed the feed tower.

5. After the feeds are all finished, they should be closed first, closed again 8 and finally closed 7. Finally, the control handle 5 moves the lifting conveyor 7 back to the original position, and the control handle 6 falls on the lifting conveyor again. Above the bracket.

6. After the entire feeding process is completed, the bulk feed carrier can only move the tanker eight plugs.

7. If you think the conveyor's rotation speed is too happy, you can adjust the lower throttle valve to make it rotate evenly.

note:

1, in the operation of the hydraulic pump handle can not be too hard, it should be uniform outward movement or pull inward.

2. When the lifting conveyor moves, it should be lifted upwards, and the rising angle cannot exceed 45 degrees. Then move it to the right and left. The angles of the two sides moving left and right should be 75 degrees each, and the whole The corner cannot exceed 135 degrees.

3, when the conveyor is restarted, it must be operated according to the requirements of the instruction manual, and it cannot be arbitrarily changed. (Text / Sun Ni)

Aluminium Rack

Aluminium Rack,Aluminium Warehouse Rack,Aluminum Flow Racks,Steel Aluminium Rack

KAM KIU ALUMINIUM GROUP , https://www.kamkiualuminium.com