The decoration of the factory is a systematic, large-scale interior decoration project, which contains many renovation projects. Here we explain the specific stages of plant decoration.

First, the preparation stage
1. Manage the lease and purchase of factory space.
At least 2-3 of the 10 customers we experienced experienced problems in space leasing and purchases that were sure to be no problem. At the end of the year, the space design and decoration preparations made with great efforts were in vain and the procedures were not handled. Property is never allowed to be renovated, so we must remind customers in particular.
2. Determine the functions that must be realized in this space This is the content that designers must know when they visit the building for the first time. Otherwise, the design cannot be started. For example, there are several functional areas, among which there are several independent Shenzhen factory buildings, and there are several open houses. There are several districts, the number of possible locations for each area, the special functional requirements for each area, and so on.
3. Examine whether designers and decoration companies have experience in public installations. Whether or not they have experience in the fitting-out of factories, mainly home improvement or other space decoration companies, will not understand the design and construction of the plant space. They lack visual display and create commercial value. The ability to use the space will expose a lot of unreasonable problems in design and construction. The unpredictable cost of the customer, the quality of the project, and the progress can hardly be guaranteed.
Second, the design stage
1. Customers contact us through consultation phone, online order and online customer service.
2, At the request of the customer to do renderings, construction drawings to customer satisfaction.
Tip: The general project is free of renderings, construction drawings.
3. Sign the project construction contract and use all drawings free of charge.
Third, the construction phase
1. Hidden project acceptance, there is space for waterproofing to do water-closing experiments.
2. Mid-term acceptance.
3. Top surface treatment.
IV. After the maintenance phase is completed, it enters the warranty period. After the customer is repaired, the maintenance personnel are in place after 24 hours, and the warranty period ends at the lifetime maintenance period.

Coil & Heat Exchangers

Technical Coil & Heat Exchangers, Electric Heater, Coil & Heat Exchangers

Guangzhou Quanxu Technology Co Ltd , https://www.anticorrosionpigment.com