Recently, with the open-phosphorus group's mineral fertilizer base Dashui Industrial Park, 1.2 million tons/year of 1.2 million tons/year of the first phase of DAP project of Dashui Industrial Park passed the acceptance test in the first stage, which enabled the company's high-concentration phosphate fertilizer production capacity to increase again. With a capacity of 1 million tons, the annual production capacity of high-concentration phosphate fertilizer is 2.6 million tons.
Since the beginning of this year, in the face of the severe impact of the financial crisis, the opening up of the Phosphorus Group crisis has become an opportunity. Through the extension of the industrial chain, the industrial structure and product structure have been optimized and upgraded. In particular, relying on the rich local phosphate rock resource advantages, the first-phase project of 1.2 million tons/year of diammonium phosphate in the Dashui Industrial Park, with a total investment of 2.8 billion yuan, was completed and put into operation on schedule, and successfully passed the first stage of production and production acceptance. , The open-phosphorus group's high concentration of phosphate fertilizer production capacity reached 2.6 million tons / year.
The second phase of the next phase of the Phosphorus Group will be completed by the end of 2010. By then, the open-phosphorus group's high-concentration phosphate fertilizer production capacity will reach 3.5 million tons/year.

Industrial Fittings

Industrial Fittings,Suction Hose Couplier Female,Camlock Type B Coupler Male,High Strength Hose Clamps

SHIJIAZHUANG STRONGFLEX I/E CO.,LTD. , https://www.hydraulichosegroups.com