Transformer Test Station Project: The intelligent transformer high-voltage test station is a new type transformer test station developed based on safer, more excellent and advanced technology in research of power transformers. The turn-key project of the intelligent transformer test station mainly consists of the station design, type selection and purchase of special equipment, equipment installation and debugging, system connection, system debugging, transformer test, training of the testing personnel, etc. The station is applicable to all delivery tests, type tests and some special tests of transformers according to IEC standards or national standards. The Company has years of experience in design and operation of the whole intelligent transformer test station (namely turn-key project of test station) and has successfully completed more than ten test station projects at home and abroad (including companies like EREVA, Siemens, Toshiba, etc.) ranging from 35kV, 66kV,110kV, 220kV, 500kV, 1000kV, etc. Particularly, the Company is at leading position in the same domestic industry in application of technologies such as optical fiber transmission, PLC automatic control, etc. which support a comprehensive intelligent measurement & control system of transformer test station, thus realizing the functions of on-site monitoring, remote transmission, simultaneous video monitoring for multiple points, automatic acquisition & recording, automatic generation of reports, etc. Major Scope of Work: 1.Design of the test station (including design of the primary and secondary systems, the equipment layout of the hall, the equipment wiring routing, embedded pipes, grounding system, etc.) 2.Selection of the test equipment (including the research and development of special comprehensive intelligentmeasurement & control system and equipment procurement) 3.Layout and installation of the test station (including installation of the primary & secondary loops, overall integration of equipment, construction of the grounding system and shielding system and so on) 4.Supply of the measurement & control system of the test station and its installation and debugging 5.Debugging of the primary and secondary systems of equipment (including combined debugging of all equipment) 6.Transformer test and training (completing the overall test of transformer according to testing standards and providing practical operation training for testing personnel ) Mode of Cooperation: 1.Provide all works of the complete test station (including design, procurement of special equipment, equipment installation & connection, supply of the control system, system debugging, transformer test, personnel training, etc.). 2.Provide part of works of the test station (each part can be separately implemented). 3.Provide works involving the upgrading the capacity of the test station and reconstruction of the measurement & control system. Frp Store Tank,Underground Frp Storage Tanks,Frp Chemical Storage Tanks,Frp Storage Tank Hebei Chunfeng International Trade Co., Ltd , https://www.cfironcastings.com
Â