On the 6th, a 15-ton coal-fired boiler in the High-tech Zone began to be demolished, which can reduce 2,000 tons of coal-burning pollution each year. This is also the largest tonnage of coal-fired boilers removed in urban areas.


Yesterday morning, in the plant area of ​​Hubei Tianyao Pharmaceutical Co., Ltd. in the High-tech Zone, the sound of “shasha” was cut and only a few workers were removing a coal-fired boiler.

Luo Mingzhi, head of the company's power department, told reporters that the 15 tons of coal-fired boiler was purchased by the company in June 2013 for 1.5 million yuan, and it was put into use for more than two years. "This demolition is indeed heart-wrenching. In order to support the government's efforts in controlling air pollution, companies are willing to make sacrifices."

According to the coal-to-gas reform document issued by the municipal government and the High-tech Zone, before February 1, 2016, enterprises (units) that have eliminated high-polluting coal-fired boilers may apply for transformation subsidies; before June 30, 2016, they will contact China Resources Gas Corporation. If the signing of "coal to gas" is possible, it may apply for a gas subsidy from China Resources Gas Company. If the high-pollution boiler is not eliminated before June 30, 2016, the environmental protection department will impose a daily penalty.

LED Streetlight

This classification mainly includes the aluminum or zinc alloy die casting parts using in LED Streetlight area.
In the die casting process,higher specific pressure is required, so that higher filling speed can be obtained.which is beneficial for alloy to overcome mold filling resistance.and effectively fill each part of the cavity.The Casting General Tolerance is Grade GB-CT4.
Process Technology: High pressure die casting,NC machining,Shot Blasting
Product Dimensions: Customized
Casting General Tolerance: Grade GB-CT4
Flow Processes: Die casting, Degating to remove the residual of the gate, Polishing and Deburring to remove the burrs, Polishing to remove the parting line, flash,CNC Turning, Cleaning, Packaging, Storaging, Shipping
Control Measure: Incoming Material Test, First Article inspection, Routing inspection, Final item inspection, and Outgoing quality control
Inspection Equipment: CMM, Caliper, Plug Gage, Screw Gauge
Application: LED Light
Certificate: IATF16949:2016,ISO14001:2015,ISO45001:2018
Lead Time: 30-35 days
Trade Term: FOB Ningbo

Die Casting LED Streetlight Components,Aluminum Casting Parts for LED Streetlight,Zinc Casting Parts for LED Streetlight

NINGBO ZHENHAI BOLANG METAL PRODUCTS FACTORY , https://www.casting-part.com