Model NO.: Apply to komatsu D20-6 Dozer
Origin: China
HS Code: 8483409000

Flange For the komatsu D20-6 Dozer Steering Clutch

Flange dozer part For the komatsu D20-6 Steering Clutch 103-22-32110

PART NAME FLANGE
EQUIPMENT Fit the D20-6 Bulldozer,Dozer
PART NO. 103-22-32110
CODE 3002800
TEETH NO. 42 Teeth
CATEGORY Construction Machinery Parts, Dozer Parts
INSTALLATION SITE Steering Clutch
APPLICATION Replacement
PROCESSING Forging
LOGO BN
MOQ 1 pc
DESCRIPTION:
1. Completely, assembly, and ready to installed in your D20-6 Dozer.
2. All components are produced by us.
3. New, undamaged.
4. 90 days warranty, call or email with any questions.
5. Carton or Plywood Case packing
6. Deliver to worldwide by Sea, Air, or Carrier.

Flange dozer part For the komatsu D20-6 Steering Clutch 103-22-32110

Flange dozer part For the komatsu D20-6 Steering Clutch 103-22-32110Flange dozer part For the komatsu D20-6 Steering Clutch 103-22-32110
  1. We are the manufacturer and own 18000 m2 factory areas, good relationship with material suppliers, which make more competitive price and steady quality.
  2. We have more than 80 units advanced facilities for production.
  3. We have 8 senior engineers with more than 30 years experience on designing and machining.
  4. Our sales term offer the efficient service for every customers.
  5. We are the long term parts supplier for many famous companies, such as FOSTER WHEELER POWER MACHINERY CO.,LTD and C.R.Dinly etc.
  6. We develop spare parts for old and new excavator models, and submit our latest products to customers every month so that to meet the market demand.
  7. We have high market share in Oversea market and Domestic market, Southeast Asia 65%, Middle East 8%, North and South America 10%,Europe 8%, Russia 5%.

Flange dozer part For the komatsu D20-6 Steering Clutch 103-22-32110Packaging & Shipping 

TRADE TERMS

EXW, FOB, CFR, CIF

PAYMENT TERMS

T/T, Western Union, Escrow

PORT

Jiangmen Port, negotiation

LEAD TIME

  1. Stock in hand: 4-7 days for processing and packing
  2. Bulk Production: 10-35 days, depend on the quantity.

DELIVERY

By Sea, Air, Carrier

ORDER FLOW

  1. Customers offer the part number, part name, model, quantity, data of items, delivery term.
  2. We quote the best price according to the requirement of customers.
  3. Confirm the purchase order and pay the deposit.
  4. We prepare and pack the goods.
  5. Customers make the payment according to the Proforma Invoice once the goods get ready for delivery.
  6. We delivery the goods with the packing list, commercial invoice, B/L and other documents requested.
  7. Track the transport and arrival about the goods. 
  8. Welcome to give us suggestion and feedback once arrival.

 

Flange dozer part For the komatsu D20-6 Steering Clutch 103-22-32110

Submerged arc welding is one of the most widely used mechanical welding methods in various industrial sectors, especially in shipbuilding, power generation equipment, boiler pressure vessels, large pipelines, rolling stock, heavy machinery, bridges, and oil refining and chemical equipment production. Technology has played a positive role in promoting the development of the welding structure manufacturing industry.

Submerged Arc Welding Wear Plate

submerged arc welding plate

JIANGSU WELLDAM WEAR-RESISTING INDUSTRIAL CO.,LTD , https://www.wedwearplate.com