There is such a car, no advertising, no 4S shop, maintenance to go to the field, can not directly on the card, the premium is very expensive, buy it to line up, this is the God car Tesla. The Chinese have always advertised that they are leading new energy vehicles, but after a few years of work, individuals still pay a small number. This can not help but ask questions: Why is Tesla late, so hot? The short Tesla test drive tour has made me feel that it is different: beautiful shape, simple operation, abundant power; it has solved, or partially solved, the continuous operation of pure electric vehicles, including Charging (helping the car owner to build a charging pile), battery warranty (according to the owner, Tesla's battery 8 years free warranty), and so on. In addition, Tesla's success is also because it captures the current trend of mind. The sales model is more like online shopping. After 70s and 80s, the owners are full of energy, love toss, and love to socialize. Even when I first mentioned the car, there were car owners who started driving around the country and installed charging piles at every hotel they stayed in. "Every time you come here, Tesla can charge." There are also tides in the tide. Although it is red and purple, Tesla is not perfect. Just delivered, its quality, after-sales service, is still unknown. However, after all, Tesla opened up new ideas for other car companies. Since all of them claim to be able to make Tesla in minutes, then you can do it quickly! Membrane/Water Wall Material and Arrangement: Heat Surface,Scraped Surface,Heat Transfer Surface,Heating Surface For Coal Boilers Jinan Boiler Group Co., Ltd. , https://www.jinanboilergroup.com
The
furnace and roof are made up of membrane water wall and hung on the
steel structure by upper hanging suspender of water cooling upper
header. Furnace intersecting surface is 3170×5290mm2 and
the elevation of top furnace is 28877mm. The membrane water wall is
made up of φ60×5 and 6×45 welding steel flat. The combustion chamber is
made of φ60×4 steel tube and welded with pin to fasten refractory
material. The upper part of combustion chamber connects with furnace
membrane water wall. The lower part connects with water cooling wind
chamber and water cooling air distributor. The water cooling wind
chamber is made up of φ60 steel tube and welded with pins to fasten the
refractory material. The water cooling distributor is welded with
φ60 steel tube and 6X45 steel flat. The small holes on the steel flat
connects with the funnel cap.
The
furnace divides left, right, front and back water circulation circuit.
The steam leading tube is made up of φ133×5 and φ108×4.5 steel tube. The
downcomer is made up of φ108×4.5 steel tube. Install the blowdown valve
under the lower header to periodic blow down.