Recently, Jinan officially promulgated the “Guidelines for the Management of Heat Metering and Energy Saving Reconstruction Projects for Existing Residential Buildings in Jinan City” to make detailed regulations on the specific work flow, management, and award funds for the “warm house” transformation.

There are early rewards for the application of the “warm house” transformation “regulations” According to reports, “the existing measurement and energy-saving heating of residential buildings” refers to the energy-saving transformation of existing building envelopes, measurement of indoor heating systems, and temperature control. Transformation, heat source (heat exchange station) and heat pipe network heat balance transformation.

According to our city's regulations, existing residential buildings that meet the transformation conditions, the owners' voluntary transformation and the transformation funds have been implemented, the transformation project implementation unit, that is, the original property unit or the entrusted unit represents the owners, and submits formal written reports to the municipal urban and rural construction committee and the municipal finance bureau. Renovation application, fill out the basic situation table of transformation project, summary table, and provide energy-saving transformation program at the same time.

The contents of the renovation project shall include the basic conditions of the renovation project, such as the completion date, the total construction area, the structural form, the heating pipe network form, the number of buildings and ridges, the number of households, etc., the building energy consumption situation and existing problems, the proposed transformation content, and the expected The amount of investment and the time for implementation of the proposed transformation. The relevant departments will review the application for transformation and the transformation plan submitted by the project implementing agency. If they meet the requirements, they will be listed in the transformation project library and receive the notification of acceptance according to the plan. They have high enthusiasm and propose applications for reconstruction as early as possible. Priority will be given to renovation plans and incentive funds.

After the transformation application is accepted, the project implementation unit shall entrust a qualified design unit to carry out energy-saving diagnosis on the proposed reconstruction, and carry out energy-saving transformation design, and issue a transformation design proposal and thermal calculation book and construction drawings. In order to reduce the design cost, a set of retrofit design schemes and construction drawings can be used in the same community with existing buildings of the same structural form. The thermal design calculation and construction drawings issued by the design unit shall entrust the Municipal Survey and Design Quality Supervision Station to conduct design review and issue review opinions.

The construction unit of the energy-saving renovation project shall openly bid for the requirements of the city. The construction unit and the supervision unit of the energy-saving renovation project shall be determined in the form of bidding and bidding, and the construction unit must have corresponding construction qualifications. Insulation renovation project construction units need to have thermal insulation construction performance of more than 30,000 square meters.

For the three comprehensive energy-saving renovation projects, a group of construction and supervision units will be selected in the form of open bidding, and the implementation unit of the transformation project may choose to use it, and may also determine the alternative for open bidding. For projects that only perform energy-saving heat-supply measurement and pipe network balance, the Municipal Municipal Public Utilities Bureau's heating management department determines the construction and supervision units in the form of bidding.

The reconstruction unit and the winning bidder must sign a contract for improvement. The three energy-saving project contract and supervision contract should be reported to the construction market and construction management department of the municipal urban and rural construction committee respectively. After the signing of the two remodeled project contracts, they shall be reported to the Municipal Heating Administration Department of the Municipal Public Administration Bureau for the record.

Before the implementation of energy conservation retrofitting of enclosures, the project implementation agency shall go through the procedures for quality and safety supervision of the energy conservation renovation project, and accept the supervision of quality and safety supervisors at any time during the construction process. Before the construction unit constructs, it is necessary to carefully prepare technical plans for renovating the construction organization, provide technical disclosure and professional technical training for the construction personnel, and perform safety protection and fire prevention measures in accordance with relevant requirements, and strictly follow the design and relevant national construction technical specifications and standards. Construction and construction logs.

The construction materials, equipment, components, products, measurement and control devices selected for the renovation project must have quality certificates, performance test reports, and site acceptance records. Wall insulation materials and heat metering devices should be selected by Shandong Provincial Department of Housing and Urban-Rural Development Department, and the heat metering device should be selected in principle from the recommended directory of the Housing and Urban-Rural Construction Department of Shandong Province. Insulation materials entering the site must be sampled for retesting and drawing tests.

Part of the project cost shall be reduced or exempted. The city shall comply with the requirements of energy conservation and be listed in the renovation project. After the project is implemented, the project implementation unit may apply for a reward fund to the Municipal Finance Bureau on the basis of the project implementation confirmation letter issued by the municipal urban and rural construction commission. During the implementation of the reform project, the municipal finance will allocate follow-up incentive and subsidy funds in batches according to the progress of the project. After the project is evaluated and accepted, the fund will be liquidated according to the results of the acceptance assessment.

The Municipal Finance Bureau and the Municipal Urban and Rural Construction Committee will supervise and inspect the use of funds and the implementation of the project. Any fraudulent, falsely confiscated, intercepted, misappropriated, or detained special funds shall be dealt with in accordance with the relevant regulations of the State upon verification. In addition, in order to support the existing energy-saving renovation of residential buildings, the project implementation unit shall, when handling all supervision and filing procedures, be subject to the payment of accidental injury insurance for workers, and other expenses shall be reduced or exempted. Design and drawing review agencies should be given preferential treatment.

High-speed Railway Concrete Mixing Plants

Features of high performance engineering type concrete batching plant: Adopt double-shaft forced concrete mixer with high mixing intensity and even mixing;Using precision metering control system, weighing more accurately;The batching machine adopts the main and auxiliary doors, and the coarse and fine measuring sensor are adopted, and the measurement is more accurate;

The pl series batching machine used in this product consists of a feeding mechanism, a weighing system, an electrical control system and other components. The structure of the batching machine is arranged in a "good" shape, which is conveyed by a belt conveyor and weighed by a plurality of sensors for accurate measurement.

The Screw Conveyor used in this product is composed of power transmission device, screw shaft, intermediate bearing seat, universal joint, etc. It has high transmission rate, good sealing performance, no dust pollution, micro-angle adjustment, sectional assembly, and easy transportation.

This product(concrete batching plant) is a fully automatic concrete mixing equipment consisting of five systems of mixing, electrical control, storage, conveying and weighing.


Large Concrete Batching Plant,Large Ready Mixed Concrete Batching Plant,Performance Concrete Batching Plant,Heavy Duty Concrete Batching Plant

Shandong Zeyu Heavy Industry Science and Technology Co.,Ltd. , https://www.sdjzcseriesdrumconcretemixer.com