Feature: Fixing Foam,Fire Rated Pu Foam,Pu Foam Adhesive,Pu Foam Waterproof Hunan Magpow Adhesive Group co.,ltd , https://www.magicglue.net
1. Various width from 400MM to 900MM
2. Sigle, double, triple grouser
3. Material: 50Mn
Wide range of track shoes are suitable for many Excavators, Bulldozers and Mini-machines, such as DAEWOO, CATERPILLAR, HITACHI,
Excavator track shoe available for Caterpillar, Komatsu, Hitachi, Kobelco,
Mitsubishi, Sumitomo, Daewoo, Hyundai, and so on.
1 Good tensile-strength based on products specifications.
2 Through quench-tempering processes to guarantee excellent mechanical properties, high strength and superior wear resistance to bending and breakage.
3 Surface hardness HBN460 for reduced wear and longer life, adding value to your products further to your business by maximizing durability of your products.
4 Precise design, carefully manufactured for proper fix easy grousering.
For more information please let us have your specific enquiry, and our quotation will be forward without delay.
Product Description
Pitch: 216mm
Place of Origin: China (Mainland)
Brand Name: YSM
Color: Yellow or Black
Material: Alloy Steel
Technology: Forging Casting
Hardness: HRC50-60
Heat treatment: Quenching
Dimensions: International Standard
Port: Xiamen
Minimum Order Quantity: 100 Piece/Pieces
Supply Ability: 10000 Piece/Pieces per Month can improve
Payment Terms: T/T
Packaging Detail: Wooden case/pallet
Delivery Detail: 10-20 days after the payment
Certificate: ISO9002
Warranty time: 6 months
Service: OEM and after-sale service
Compatible models:
Pitch 228mm, single grouser track shoe for bulldozer:
1) CAT: D8H, D8K, D8L, D8N 2) Komatsu: D120A, D135A, D150A, D155, D275
Pitch 135mm, triple grouser track shoe for excavator
2) Komatsu: PC40r, PC45, PC60, PC60u
3) Hitachi: Ex45, ex40
4) Kobelco: K903, k903A, k903b, k903c
Pitch 190mm, triple grouser track shoe for excavator:
1) Kato: HD900
2) Kobelco: K909, SK150LC, SK160LC, SK200, SK210, SK220LC
3) Komatsu: PC150, PC180, PC200, PC210, PC220, PC230, PC240
4) R902LC R912HDSL, R922HDSL, R932HDS
5) Caterpillar: 219, 225, 315, 317, 318, 320, 322, E200B, E240, E330
6) Hitachi: EX200, EX210H, EX220
Pitch 216mm, triple grouser track shoe for excavator:
1) Kato: HD1500, HD1800, HD1880
2) Kobelco: Sk300, sk400, k914, k916
3) Komatsu: PC300, PC350, PC360, PC400, PC450
4) Hs841, hs842, hs850, r952, r954, r961, r962, r965, r971
5) Mitsubishi: Ms350, ms380, ms450, cat: 235, 330, e450
6) Hitachi: Ex400, uh14, uh16, uh171, uh172, uh181
7) Hyundai: R350, r420, r450LC
8) Hyundai: R200LC, R210LC
9) JCB: JS200, JS220
10) Mitsubishi: MS160L, MS230, MS240, MS270, MS280, MS300
Pitch 171mm, single grouser track shoe for bulldozer:
CAT: D4D, D4E, D4H, D5C, D5M, D6, D6B, 561B, 561C, 561D, 561H, 933, 939, 935, 941, 943
Pitch 203mm, single grouser track shoe for bulldozer
1) CAT: D6C, D6D, D6E, D6G, D6H, D6R, D7, D7C, D7D, D8, D8D, D8E, D8G
2) Komatsu: D60A, D60E, D60F, D60P, D60S, D65A, D65E, D65P, D65S, D68E, D68P, D75A
Pitch 216mm, single grouser track shoe for bulldozer:
1) CAT: D7E, D7F, D7G, D7H
2) Komatsu: D60A, D60E, D60F, D60P, D60S, D65A, D65E, D65P, D65S, D68E, D68P, D75A
This product combined the functions of heat insulation, cold insulation, moisture-proof, quakeproof, insulation, sealing, seal, heat preservation, cementation together,with the characteristics of high foaming quantity, the flexibility good, the cementation intensity high, characteristics and so on .It is the modern most ideal new building material, has the environmental protection energy conservation, construction convenience
Scope of application:
Windows and doors installment: Between windows and doors and wall sealing seal, fixed caking.
Advertisement model: The model, the sand table manufacture, unfolds board patching.
Sound-insulated noise elimination: Repair and so on the time language sound chamber, broadcast studio slit fills, may play the sound-insulated noise elimination role.
The gardening makes the scenery: Flower arrangement, slit, wall brick, brick, floor patching.
Guards against the water blocking to leak: Loophole and so on water conduct, sewer patching, stop up originally leak.
Packing and transportation: Prevent the expensive the fragile goods from broken, time saving and fast, earthquake durable.
Using Method:
1. 3-5 hour.
2. Before the use, sways the hoisting bucket fully (at least 20 times), guarantees in the pot the material to be even.
3.If uses the gun type froth sealing medicinal preparation, when use the hoisting bucket inversion and the spray gun screw joint, revolving opens the flow valve, after the adjustment current capacity carries on again spraying.
4. When spraying pays attention to the approaching speed, usually sprays the quantity to have to fill the volume one half then. Filled when the vertical slit when should from bottom to top, on the packing such as ceiling slit, as a result of the gravity function, the solidification froth possibly has not been able to fall, after suggested just filled carries on the suitable support, treated the froth solidification and evacuates the support again after the seam wall caking.
5. About 10 minutes, the froth skin drying, after 1 hour the froth solidifies approximately, and the froth achieves the best load-bearing effect stably in g.
6. Slices the extra amount froth with the knife, then in superficial water used soil mortar, coating or silica gel .Before the construction, should remove the greasy dirt and the floating dust from the surface, and sprays the few water in the construction surface, causes its moistly
7. the use finished, takes down the hoisting bucket, cleans cleanly with the special-purpose cleansing agent the spray gun