Recently, Mazda (China) Enterprise Management Co., Ltd. filed a recall plan with the AQSIQ. It will recall some imported Mazda5 cars from April 14, 2017. From March 1, 2017, some imported CX- will be recalled. 5 and Mazda3 cars. According to the company's statistics, there are 30,190 vehicles in mainland China. details as follows:
C(1)the stamping process of high production
efficiency, and easy to operate, easy to realize mechanization and
automation.This is because the stamping is depend on the die and stamping
equipment to complete the processing, ordinary press stroke times per minute
can reach dozens of times, high pressure to can reach more than hundreds of
times or even one thousand times per minute, and every time stamping stroke can
get one piece.
(2) when the mold to ensure the stamping
precision Stamping Parts of the size and shape, and generally does not destroy
the surface of the stamping parts quality, and the life of the mould are long,
so the stamping quality is stable, good compatibility, has the characteristics
of "the same".
(3) stamping machining size range is
larger, more complex shape parts, such as small to watch the stopwatch, big to
auto longeron, covering parts, etc., and stamping material hardening effect of
cold deformation, the strength and stiffness of stamping was high.
(4) stamping generally no chip broken
material, material consumption is less, and do not need other heating
equipment, it is a kind of material, machining method of energy saving,
stamping parts of the cost is low.
stainless steel parts are very popular in
forging process. We can supply big range of such stainless steel stamping
parts.
B Main
particulars
MAIN
PARTICULARS
Material
stainless
steel
Standard
ASTM, ASME, DIN, JIS,
ISO, BS, API, EN
Certificate
ISO9001,
BV
Dimension
As
per drawing, as large as we can
Processing
Laser/Line
cutting, Stamping, CNC Punching, CNC Bending, Welding, Assembling, ect.
Finishing
surface
Machined
surface with oil, blasting and painting, anodize, polishing, powder painting,
electrophoretic coating-
Marking
as
per clients` requirements
Inspection
material,
construction, dimension, heat treatment, hardness, NDT
Quality
ISO9001,
PPAP control production
Lead
time
10-30
days for sample, consult with customer for mass production
Delivery
Express
for sample, ocean shipping/air for mass production
Our
Capabilities
CNC
machining, CNC center machining, drilling, milling, turning, grinding,
tapping, boring
Engineering
& manufacturing services
R&D
process, tooling and gauging design, product design
Integrated
CAD/CAM system, test and measuring
Others
Recyclable,
in line with environmental requirements and standards, and reliable
Finishing
surface
Machined
surface with oil, blasting and painting, anodize, polishing, powder painting,
electrophoretic coating-
C.
Construction
Construction
by stamping and machining
D
Workmanship
The
workmanship have good production practice. Care are taken to ensure High
accuracy and smooth surfaces
E.
Certificates
-
Material certificates
-
Measuring reports
-
Inspection protocol
-
NDT reports
-
Fixed certificate: ISO9001 certificate
Our
service
Besides
above the general specifications, we can also supply some specific machining
parts as clients' requirements.
Package
and shipping
Export
cartons, pallets, wooden cases, Polybags
container
package and container transportation
Stainless Steel Stamping Parts Stainless Steel Stamping Parts,Metal Stamping Stainless Parts,Stainless Steel Stamping Accessories,Metal Stainless Steel Stamping Parts Shinvast Industry Ltd , http://www.shinvastindustry.com
(1) The total number of Mazda5 sedan produced from November 16, 2010 to November 13, 2015 is 16,448 units;
(2) The total number of CX-5 sedan produced from April 18, 2012 to May 31, 2013 is 3,323;
(3) The total number of Mazda3 cars produced from May 26, 2009 to June 17, 2011 was 10,419.
Some vehicles in this recall range are not properly painted due to the outer cover of the pneumatic support rod of the rear door, and may be corroded by the influence of salt in areas with salt damage. In this case, continuous use may result in increased corrosion, expansion of the outer cylinder, cracking of the outer cylinder cover, and rupture of the outer cylinder when the rear door is opened. In extreme cases, it may cause injury to surrounding people and pose a safety hazard.
Mazda (China) Enterprise Management Co., Ltd. will replace the improved rear door pneumatic support rods for vehicles within the scope of the recall to eliminate defects.
Mazda (China) Enterprise Management Co., Ltd. will entrust FAW Mazda Automobile Sales Co., Ltd. and Changan Mazda Automobile Sales Branch to inform customers by letter, telephone and other forms. After the official start of the recall, Mazda authorized dealers will take the initiative to contact the relevant owners to arrange the recall. Users can call FAW Mazda Customer Service Center, 0431-85991000 and Changan Mazda Customer Service Center, 800-807-2777 for consultation. Users can also visit the AQSIQ website inspection and supervision department (jyjgs.aqsiq.gov.cn), the AQSIQ Defective Product Management Center website () and the WeChat public account (AQSIQDPAC) to learn more. information. In addition, you can also call the Defective Product Management Center hotline or the local entry-exit inspection and quarantine agency's quality hotline: 12365 (switch No. 2), reflecting the problems in the implementation of the recall or submitting defects.